工程动态

Engineering Dynamics

undefined
+
  • undefined

Jinfeng all-electric robot intelligent control raw material transportation project

关键词:国家建筑工程施工总承包,市政公用工程总承包,建筑装修装饰工程专业承包三壹级资质

The Jinfeng all-electric robot intelligent control raw material transportation project was launched on June 19, 2021. It is a raw material transportation project invested and constructed by Jiangsu Jinfeng Cement Group with a total annual limestone delivery of 50 million tons, with a total construction area of 185,600 square meters (110,000 sheds) m², Jinshan Crushing 39155 m², Changshan Crushing 36434 m²), limestone long belt conveyor corridor about 12 kilometers. The biggest difficulty of the project is the long span, many monomers, tight construction period, and poor construction conditions. Among them, the limestone long belt conveyor corridor is about 12 kilometers from the factory area to Qianfeng Mountain, crossing S239 Provincial Highway, Lining Expressway, S360 Provincial Highway, For Qiansong Reservoir, X002 County Road, Zhoucheng River, several rural access roads, river ponds, etc., there is a group of corridor supports every 30 meters, with a maximum span of 55 meters.

Jinfeng all-electric robot intelligent control raw material transportation project Details

上一页

下一页

上一页

下一页

Related Cases

Message

If you have any needs, please feel free to contact us at any time

Submit
%{tishi_zhanwei}%