Cases

Jinfeng all-electric robot intelligent control raw material transportation project


The Jinfeng all-electric robot intelligent control raw material transportation project was launched on June 19, 2021. It is a raw material transportation project invested and constructed by Jiangsu Jinfeng Cement Group with a total annual limestone delivery of 50 million tons, with a total construction area of 185,600 square meters (110,000 sheds) m², Jinshan Crushing 39155 m², Changshan Crushing 36434 m²), limestone long belt conveyor corridor about 12 kilometers. The biggest difficulty of the project is the long span, many monomers, tight construction period, and poor construction conditions. Among them, the limestone long belt conveyor corridor is about 12 kilometers from the factory area to Qianfeng Mountain, crossing S239 Provincial Highway, Lining Expressway, S360 Provincial Highway, For Qiansong Reservoir, X002 County Road, Zhoucheng River, several rural access roads, river ponds, etc., there is a group of corridor supports every 30 meters, with a maximum span of 55 meters.
MORE

Liyang Waste Disposal Plant


The project is located in the area south of Xinjinfeng Cement Co., Ltd., Shezhu Town, Liyang City, with a total investment of 580 million yuan. Using the 4# 4500t/d rotary kiln production line of Jiangsu Jinfeng Cement Group Co., Ltd. and the 7#, 8#, 9# 4500t/d rotary kiln production lines of Liyang Xinjinfeng Cement Co., Ltd., a total of four cement production lines (three uses and one backup) are fired , Raw materials, and cement making system to jointly dispose of domestic waste, with a daily processing capacity of 900 tons and an annual processing capacity of 330,000 tons; use the 2# 4500t/d cement kiln production line of Jiangsu Jinfeng Cement Group Co., Ltd. to coordinate firing, raw materials, and cement making systems Disposal of construction waste projects with a daily processing capacity of 500 tons/day and an annual processing capacity of 150,000 tons; use the 3# 4500t/d cement kiln production line of Jiangsu Jinfeng Cement Group Co., Ltd. to co-process the food waste project with the firing, raw material and cement production system , with a daily processing capacity of 100 tons/day and an annual processing capacity of 30,000 tons; use waste heat to build an 18MW waste-to-energy project.
MORE

Suzhou Economic and Technological Development Zone Biomedical Science and Technology Park Phase II


The project is located in the south of Jinjiang 5th Road, the west of Jintai 5th Road, and the north of Jinjiang 6th Road in Suzhou Economic and Technological Development Zone. The planned total land area is about 168,600 square meters. A high-tech application gathering area integrating training consulting and biomedical business incubators. The second phase of the project constructed by our company has a construction area of ​​about 92,000 square meters and a construction period of 330 days.
MORE

Weifu Factory


Weifu Industrial Park is located in Wuxi High-tech Development Zone. After the completion of Weifu Industrial Park, it will form an industrial scale of over 10 billion yuan, and form a technological innovation and industry-university-research platform integrating national technology centers, engineering centers, academician workstations, postdoctoral research workstations, and world-class basic test centers in the new area. 
MORE

Jinfeng all-electric robot intelligent control raw material transportation project


The Jinfeng all-electric robot intelligent control raw material transportation project was launched on June 19, 2021. It is a raw material transportation project invested and constructed by Jiangsu Jinfeng Cement Group with a total annual limestone delivery of 50 million tons, with a total construction area of ​​185,600 square meters (110,000 sheds) m², Jinshan Crushing 39155 m², Changshan Crushing 36434 m²), limestone long belt conveyor corridor about 12 kilometers. The biggest difficulty of the project is the long span, many monomers, tight construction period, and poor construction conditions. Among them, the limestone long belt conveyor corridor is about 12 kilometers from the factory area to Qianfeng Mountain, crossing S239 Provincial Highway, Lining Expressway, S360 Provincial Highway, For Qiansong Reservoir, X002 County Road, Zhoucheng River, several rural access roads, river ponds, etc., there is a group of corridor supports every 30 meters, with a maximum span of 55 meters.
MORE

Liyang power battery heat exchange project


The power battery heat exchange project developed by Liyang Zongguanxian Heat Exchanger Co., Ltd.—office building and 1# plant project is located on the northwest side of Lenovo Road, Zhongguancun Science and Technology Industrial Park, Liyang. The project includes a 4-story frame structure factory building, a 6-story frame structure office building, and off-site auxiliary structures such as guards and walls. Among them, the construction area of 1# workshop is 32160.71㎡, and the building height is 28.1m; the above-ground construction area of the office building is 11459.42㎡, the underground construction area is 439.83㎡, and the construction height is 24.4m.
MORE

Jiangsu Zhongguancun Standard Factory Building Phase II 1 Bid Project


Jiangsu Zhongguancun Standard Plant Phase II Bid Section 1 Project is located in Jiangsu Zhongguancun Park, with a total construction area of 60,376.4 square meters, including about 30,000 square meters of production space, about 8,100 square meters of office space, and about 22,900 square meters of auxiliary buildings rice. The main construction scope of this project includes 1-2# factory building, office building, dormitory, canteen, tool room, power distribution room, guard and outdoor ancillary works; the factory building is a two-story steel frame structure with a building height of 12.65m; the office building is three One-story frame structure with a building height of 13.65m; the dormitory is a five-story frame structure with a building height of 18.25m; the canteen is a two-story frame structure with a building height of 9.3m. The winning bid price is 170,348,848,540,000 yuan, and the effective construction period is 349 days. The project is an investment and construction project of Jiangsu Lilong Science and Technology Development Co., Ltd., and will be delivered to Luxshare Precision Industry Co., Ltd. after completion.
MORE

The first phase of the construction project of key components of commercial vehicles


The first phase of the commercial vehicle key parts construction project is located at No. 18, Shaoshan Road, High-tech Zone, Changzhou City. The total construction area is 216,200 square meters. The construction of Zhengfang Garden is one of the bidding projects, with a total construction area of 13716.01 square meters.
MORE

Asia-Pacific New Energy Automobile Aluminum Plant


The Asia-Pacific project department is located in Xinwu District, Wuxi City. The south side of the plot is Lihe Road, the north side is Xinbahe, and the east side is Jinma Road. The Asia-Pacific project is a new factory building invested and constructed by Jiangsu Asia-Pacific Light Alloy Technology Co., Ltd. with an annual output of 65,000 tons of new energy automobile aluminum projects. Among them, the above-ground construction area is 91,191.93 square meters, the underground construction area is 13,747 square meters, and the building base area is 84,490.59 square meters; partly one floor underground, one floor above ground, and some two floors above ground, and the building height is 17.75 meters.
MORE

Expansion of 2# and 3# workshop project of Anhui Xuancheng Valin Precision Technology Co., Ltd.


Xuancheng Valin Precision Technology Co., Ltd. is a listed company, mainly engaged in the R&D, manufacturing and sales of elevator accessories and steel structural parts. Group, with a construction area of 16,000 square meters, the planned completion time is January 15, 2020, and the construction period is 195 days.
MORE

Liyang Tanyuan Optoelectronics Technology Co., Ltd. Phase I 4#5# Factory Building II Bid Section (C-D-E District) Project


The second phase of the 4# and 5# factory buildings (C-D-E area) project, the project is located in the west of Tianmuhu Avenue in Liyang City, north of Kangping Road (opposite to Kangping Testing Center), the construction area of this bidding section is about 65,500 square meters, which is the frame 4 Layer structure, partial 3, 5 floors, construction period 225 days.
MORE