工程动态
Engineering Dynamics
Reconstruction and expansion of the second phase of the psychiatric ward building of Wuxi Jingwei Center
关键词:国家建筑工程施工总承包,市政公用工程总承包,建筑装修装饰工程专业承包三壹级资质
Reconstruction and expansion of the second phase of the psychiatric ward building of Wuxi Jingwei Center Details
The second-phase reconstruction and expansion project of the psychiatric ward building of Wuxi Mental Health Center is located at No. 156, Qianrong Road, Binhu District, Wuxi City, with Qinxin Avenue on the north, Qianrong Road on the east, Qinyuan Road on the west, and Qinyuan Road on the south. Qianhu Road has a total construction area of 87,012 square meters, of which the above-ground construction area is 68,556 square meters and the underground construction area is 18,456 square meters. The construction unit is Wuxi City Investment Development Co., Ltd., and the design unit is Tus Design Group Co., Ltd. The effective construction period is 600 calendar days, and the total cost is about 380 million yuan.
The project includes construction projects such as comprehensive building, logistics support building, welfare hospital ward building, etc. Among them, the largest single building 1# comprehensive building has 9 floors above the ground, the building height is 39.35 meters, and the construction area is 49208.11 square meters; the 2# logistics support building is on the ground 6 floors, with a building height of 22.45 meters and a building area of 10,708.26 square meters; 3# welfare home ward building has 6 floors above ground, a building height of 22.5 meters, and a building area of 8,248.79 square meters. The façade will be a curved curtain wall.
Related Cases
Message
Address: Zhengfangyuan Science and Technology Building, 999-7 Gaolang East Road, Wuxi City
Scan Follow
WeChat
Copyright © 2023 ZHENG FANG YUAN GROUP 丨 Business License