Xindao micro-nano device workshop
The project is invested and constructed by Wuxi Leading Intelligent Equipment Co., Ltd. The planned construction area is 129,313 square meters, with four new factory buildings and one R&D office building, with a total construction area of 188,637 square meters. It will be constructed in two phases. At present, the first phase of the construction project - 1 and 2# workshops is ready to start. 1# factory building has 4 floors above ground (floor height 6500/6000/5500/5500), partial (interlayer) five floors, single floor area of 9717.96㎡, construction area of 40298.17㎡; 2# factory building has 3 floors above ground (floor height of 9500/7500/6500 ), partial (mezzanine) four floors, with a single floor area of 15447.㎡ and a construction area of 50208.61㎡; the building height is 23.65m. The total construction area of the first phase project is 90506.78㎡, and the total construction period is 335 days. The project is planned to start on December 11, 2018 and complete on November 10, 2019.
MORE
The laser welding equipment project of Jiangsu Lianying Laser Co., Ltd. is invested by Shenzhen Lianying Laser Co., Ltd. with a total asset of 1 billion yuan and a land area of about 122 acres. It will build 117,000 square meters of industrial plants and office R&D buildings, and build two R&D buildings There are housing buildings, one of which is the laser research and development center and administrative office area, and the other is the automation and automotive equipment research and development center. It mainly develops, produces and sells various new energy power battery welding production lines, auto parts welding production lines and complete vehicle welding assembly lines, and builds a new energy vehicle production equipment base. After the project is put into production, the sales revenue will reach 1 billion yuan. The project will be implemented in two phases, of which the investment in the first phase is 500 million yuan. The designed production capacity will produce 500 sets of laser welding system products per year. It is expected to be completed and put into operation in October 2018.
MORE
Bühler grain processing complete equipment manufacturing plant and office building project
The newly-built production and management buildings for the complete set of grain processing equipment manufacturing project - combined workshops and office buildings are located in Tianmu Lake Industrial Park, Liyang City, on the west side of Yunmei Road and north side of Shengzhuang Road. The project consists of joint workshops and office buildings. The steel structure single-story factory building has a single area of 134,313 square meters. The office building is a frame structure with three floors above ground and one floor underground. The total construction area is 165168 square meters
MORE
Address: Zhengfangyuan Science and Technology Building, 999-7 Gaolang East Road, Wuxi City
Scan Follow
WeChat
Copyright © 2023 ZHENG FANG YUAN GROUP 丨 Business License